Portfolio
My recent accomplishments
(selection 2016 - 2024)
RSA A24 highway
The 5 km long A24 will be opened on December 7th, 2024. It links the highways A20 and A15 through the Vlaardingen and Rozenburg split level interchanges. The A24 contains two tunnels: the Holland tunnel is about 480 m long and is a land tunnel to cross beneath a vulnerable marshland reserve. The Maasdeltatunnel is over 1300 m long and crosses underneath the Scheur waterway which connects to the Rotterdam Port.
In August 2024 I carried out the pre-opening road safety audit for this complicated project which is the core of the Blankenburgverbinding. My client is the Consortium BAAK (contractor), the project owner is the Dutch national road authority Rijkswaterstaat. The Blankenburg connection project is the result of the Masterplan Rotterdam Vooruit (Rotterdam Forward, 2009). The master plan describes the vision on the accessibility of the Rotterdam region for the period 2020 - 2040. Spatial, economic and social developments are coordinated in this. The master plan forms the basis for the Blankenburg connection.
Netherlands
Road safety audits relating to the realignment of the A20 highway as part of the Blankenburg connection in the Rotterdam conurbation passing with two tunnels underneath the port access channel.
The Blankenburg connection connects the A20 near Vlaardingen (north bank) and the A15 near Rozenburg (south bank) by means of a new motorway, the A24.
N.B.: in JV with De Baan Verkeersadvies
Türkiye
Cambodia
Road Safety Expert for Technical Assistance to Sustainable Assets for Agricultural Markets, Business and Trade Project: development of Rural Road Management Plan, road safety manuals (audits, inspections) and staff capactiy building
Netherlands
Road Safety Engineer for assessment of preliminary design of urban roads as part of an urban development plan to transform the entrance of Zoetermeer Municipality into green park and a vibrant and inclusive residential district
Türkiye
Tanzania
Road Safety Auditor/Team Leader for Accident Analysis, Final Design and Roadworks Road Safety Audits and Awareness Campaign for Dar es Salaam Bus Rapid Transit System Project – Phase 2 (20.3 km)
Netherlands
Road Safety Inspector to investigate and advise on non-motorized traffic safety at narrow Roggebot bridge passing of N307 Dronten – Kampen provincial road during reconstruction works in the Province of Flevoland